After the pre-assembly inspection of steel structural parts is qualified, the center line, the control reference line and other marks should be marked, and the locator should be set if necessary. The assembled steel structure parts should be numbered in obvious parts, and the drawing number, component number and number of pieces should be written so that the installation on the construction site can be carried out smoothly.
Main steel frame | H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe |
Secondary frame | hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc. |
Roof panel | EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and PU sandwich panel or steel sheet |
Wall panel | Sandwich Panel or Corrugated Steel Sheet |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Knee Brace | Angle Steel |
Roof Gutter | Color Steel Sheet |
Drawing | We can make the design and quotation according to your require or your drawing |